| Bid 33994 | ||||||||||||||||
| Concrete Materials | ||||||||||||||||
| 17-Jan-12 | ||||||||||||||||
| TEAM ELMERS | FISHER SAND | |||||||||||||||
| TRAVERSE CITY | MIDLAND | |||||||||||||||
| UNIT | TOTAL | UNIT | TOTAL | UNIT | TOTAL | |||||||||||
| ITEM | QTY | DESCRIPTION | COST | COST | COST | COST | COST | COST | ||||||||
| 1 | 25 | Cubic yards of Type I (9 bag) concrete mix | 102.00 | 2,550.00 | 103.00 | 2,575.00 | ||||||||||
| delivered to site | ||||||||||||||||
| 2 | 950 | Cubic yards of Type II (6 bag) concrete mix | 83.00 | 78,850.00 | 85.00 | 80,750.00 | ||||||||||
| delivered to site | ||||||||||||||||
| 2% Calcium added to concrete mix, as needed | 3.00/cu yd | 4.00/cu yd | /cu yd | |||||||||||||
| 1 1/2% Calcium added to concrete mix, as needed | 2.25/cu yd | 3.00/cu yd | /cu yd | |||||||||||||
| 1% Calcuim added to conrete mix, as needed | 1.50/cu yd | 2.00/cu yd | /cu yd | |||||||||||||
| 1/2 % Calcuim added to concrete mix, as needed | .75/cu yd | 1.00/cu yd | /cu yd | |||||||||||||
| Heating of concrete mix, as needed | 6.00 | 6.00 | ||||||||||||||
| 3 | 2500 | Feet of 4-inch expansion joint (1/2" thick) | 0.30 | 750.00 | 0.30 | 750.00 | ||||||||||
| 4 | 200 | Feet of 6-inch expansion joint (1/2" thick) | 0.48 | 96.00 | 0.50 | 100.00 | ||||||||||
| 5 | 750 | Feet of re-rod (1/2") | ||||||||||||||
| --10-foot lengths | 4.00 | 4.00 | ||||||||||||||
| --20-foot lengths | 8.00 | 8.00 | ||||||||||||||
| Additional charges for small loads | 75.00 | 75.00 - 4 yd or less | ||||||||||||||
| Additional charges for extra unloading time | 90.00 | 95.00/hr | ||||||||||||||